- The scheduler keeps one registry of the runs this process has open, for the interval jobs and the
ad-hoc runs alike. A row the table still says is `running` but no run here has open (its outcome
failed to write) reads as interrupted, as the next start's sweep will close it: no pulsing dot
beside "No run recorded yet".
- Migration 0109's downgrade sums a still-running run's quota events into its spend before the link
to them is dropped, as the startup sweep would.
- A test holds that a dialog closing onto the same address leaves an open log line open.
- The channel-backfill row says "running" from the runs this process has open, not from the table:
a row whose outcome failed to write no longer reads as running until a restart. The run still
going leads the row, so a newer run's outcome never sits under the older one's channel.
- Migration 0109's downgrade carries every run's trigger, spend and start in the audit row, and the
upgrade restores them: a manual run whose admin was deleted stays manual.
- Back/Forward is read by the page's one popstate listener, both halves in one render; the server
log adopts its half during that render, so no read goes out with one entry's filters and the
other's range.
- The server log's failed facets use the other tabs' words (the menus may be short); the accounts
message shows only when the menu really lacks them.
Backend
- A run's outcome write sits outside the job's own try: a database blip after a run that
succeeded no longer records it as failed (the row waits for the next start's sweep).
- An interrupted run keeps what it spent (the sweep sums its quota rows, as finish does).
- The Scheduler's ad-hoc row says running while any backfill runs, not only the newest.
- recent_runs reads each job's last runs off its index instead of ranking the whole table.
- An interval change is stored with its audit row in one transaction, then rescheduled.
- One API instance per database is the stated contract (.env.example, jobruns).
- Turning full history on for a channel already complete records no run.
- Migration 0109 round-trips interrupted and ad-hoc runs; the run words' DB CHECKs are
test-held to the enums; the account filter is one helper for the four activity reads.
- An audit row says how many of its request's log lines are still kept.
Frontend
- An "All" period reaches every row still kept (runs and admin actions outlive 90 days).
- Back/Forward is followed in place by the server log: a closing dialog no longer turns
Live off; a pivot still opens a fresh log.
- Runs moved over from the audit log read their one-liner in the reader's language.
- Filter choices or accounts that failed to load say so beside the filters, with a retry.
- An old server-log link keeps its account, text and range; a remembered retired page
opens its tab.
- A request whose lines are gone says so instead of linking to an empty list.
- The log lines and the history rows share one row frame, and the server log one list
frame with the other tabs; an empty list is announced; each day's quota is readable.
What a job last did lived in the API process's memory and was gone at
every restart; the audit log kept a run only when it was manual, failed
or changed something. Now each run is a job_runs row written at its
start and its end in its own session: who started it, its outcome as
data, what it spent of the YouTube quota (quota_events.job_run_id) and
the lines it logged (log_events.run_id, filterable in the log console).
- a run a stopped process left open is marked interrupted at startup
- "run now" is a one-shot job on the scheduler, which now always starts
(interval jobs only with SCHEDULER_ENABLED); the manual actor is reset
after the run, since pool threads are reused
- the dashboard's last run comes from job_runs, so it survives a deploy
- runs leave the audit log: migration 0109 moves the old job_run rows
over (and back on downgrade); the audit page's run folding goes
- job_run_retention_days (default 30) prunes old runs in audit_gc